← Catalogue
💻 Technology  🧠 Freddy

Waterfall Project Management Methodology

— A linear, sequential approach to project management, where each phase must be completed before the next begins.

Waterfall Project Management Methodology
Released
1970 (formalized)
Era
Mid-20th Century, formalized 1970s
Origin
Often attributed to Winston W. Royce's 1970 paper, though he presented it as a flawed model.
Key Principle
Each phase must be completed and reviewed before the next phase can begin.
Typical Phases
Requirements, Design, Implementation, Verification (Testing), and Maintenance.
Documentation Emphasis
Heavily reliant on comprehensive documentation at each stage.
Flexibility
Generally considered less flexible than iterative methodologies due to its rigid structure.
Suitability
Best for projects with stable requirements and clear objectives where changes are infrequent.
Common Criticism
Can lead to late discovery of issues and difficulty in adapting to evolving client needs.
About this item

The Waterfall model is one of the oldest and most traditional approaches to project management, characterized by its linear, sequential flow. It breaks down project development into distinct phases, such as requirements gathering, design, implementation, testing, and maintenance, with each phase strictly following the previous one. This methodology emphasizes thorough planning and documentation upfront, aiming to define all project requirements before any development work begins. Its structured nature makes it suitable for projects with well-defined scopes and stable requirements, where changes are expected to be minimal.

project managementsoftware developmentmethodologysequentiallinearplanningtraditional
Connected items
Explore further
🏪
Collector
Find this at a show or convention near you
💬
Opinions
See what people think — coming soon
📷
Scan with KronosVision
Point your camera at yours to verify it
★ This is a neutral encyclopaedia entry. No prices, no buy buttons, no affiliate links. Facts only.